The 2023 Florida Statutes (including Special Session C)
|
||||||
|
. . . Meanwhile, McLaughlin disbursed $269,625.77 from the $400,00.00 Escrow (the “$269,-625.77 Loan”) without . . . $350,000.00 Construction Loan, the $98,000.00 Construction Loan, and the $269,625.77 Loan (the “Second ($717,-625.77 . . .